Boston Public Schools – Boston Latin Academy – Lighting Retrofit

Screen Shot 2014-05-27 at 12.52.12 PMPrime Contractor: Prism Energy Services
Electrical Crew: 6

Scope: Replaced gymnasium light fixtures with 12 energy-efficient T5 HO high bay lamps with integral occupancy sensor controls. Value-engineering in field for new layout of circuitry.

Highlights:
Constructed 30’ pipe-staging to enable crew of 6 electricians to provide ultra fast-track/one day installation during Thanksgiving break, minimizing disruption to school. Discovered existing light fixtures had remote ballasts and devised plan to rework circuitry in attic crawl space above gym to accommodate new lighting design.