SIZE
GC
Owner
Electrical crew at peak
Recent Projects
Scope: Comprehensive electrical renovation of historic, 18-story high-rise. This massive electrical separation project, included revising the building’s power distribution system and paring it down to a base building system for tenant use. Installation of new power distribution system, emergency power, lighting control system, and upgrades to fire alarm system. Additionally, the 12 floor electrical fit-out for primary tenant, Brown Brothers Harriman.
Highlights
• Installation of 4 electric vaults, working in tandem with NSTAR
• All new power distribution to electrical motors, new life safety generator, and emergency distribution system
• Demolition of 12 floors, plus lobby, followed by 400,000 sq. ft. build-out of state-of-the-art office space for primary tenant, Brown Brothers Harriman
• Electrical installations in renovated lobby
• Updating building’s entire electrical and fire alarm systems, bringing them up to code
• Upgrading fire alarm system to state-of-the-art
• Installation of new lighting and lighting control system
• Parking garage lighting installations
• Timeline: 2 years, including 6 months electrical separation off peak of cooling season