Scope: Spread-out of 4 separate concurrent projects, J &M Brown was the electrical contractor for Raytheon’s new lab testing facilities. These industrial projects main scope was installing thousands of feet of wiremold with special receptacles and dozens of panelboards. Pre-fabricated played a key role in quality and uniformity throughout all the rooms.
Highlights
Schedule: 8 months
Pre-fabricated panel cabinets with gunners and troughs
Wiremold assemblies constructed in pre-fab shop and delivered to site in sections