MIT Building 4 EAPS Lab – Cambridge, MA

J&M Brown was the electrical contractor for a new lab space in MIT’s Building 4. J&M Brown demoed the existing lab and installed all new electrical systems including a Simplex 4100 Node, overhead wiremold and all the lab equipment connections (fume hoods, ceiling utility panels, etc.). Per MIT standards, all wiring was done in EMT. J&M Brown worked across multiple buildings and two penthouses to bring new feeders for the distribution panels and power for the new HVAC equipment.

Highlights

New 400′ parallel feeders across rooftops for existing generator
Electrical construction of a Clean Room
Bringing an old service elevator back online
Running a new 600A feeder through 3 existing building into new lab space