SIZE
GC
Owner
Electrical crew at peak
Recent Projects
CAD coordination was utilized before construction to layout all ceiling work for this open concept project. Upon approval, J & M Brown installed 640′ of cable tray and laid-out hundreds of pendant fixtures. The project spanned across two floors that included open-office areas, conference rooms, a Tech Talk room and kitchens. An extensive lighting
control package included 71 ESN panels from Lutron with wireless photocells, occupancy sensors and switches.
Highlights
• 200′ of wiremold AL2000
• Wireless Lutron controls throughout space
• Completely new distribution system
• Low-profile LED light fixtures
• Timeline: 6 months