LabCentral – 238 Main St, Cambridge, MA

By February 12, 2021September 8th, 2021Life Sciences

Size: 35,400 sq/ft
GC: Turner Construction
Owner/Developer: MITIMCo

LabCentral expanded their presence into a new biotech building in the heart of Kendall Square. LabCentral’s phase 1 consists of a floor of labs and a floor of offices with amenities. J&M Brown performed all the electrical construction for phase 1, including but not limiting to: lighting, distribution, power and fire alarm.

Highlights:

  • This fit-out spans across two adjacent buildings and careful BIM coordination had to be considered to meet the requirements in each building.
  • Seimens was used as the distribution and ATS manufacturer
  • Pre-fabrication of the CUPs