SIZE
GC
Owner
Electrical crew at peak
Recent Projects
Installation of technically advanced, comprehensive fire alarm system in occupied 38-story high-rise while maintaining operation of existing system at all times and without disruption to daily operations of the hotel.
Highlights
• Simplex Grinnell addressable high-rise, voice evacuation system
• Replaced entire fire alarm system in occupied hotel
• Voice and manual fan controls installed throughout hotel
• Sounder-based smoke detectors installed in all common areas and guest rooms
• Two fully handicap-accessible floors equipped with visual devices strobe for hearing impaired
• Timeline: 18-months in three phases