Boston Consulting Group, 200 Pier 4, Boston MA

By June 26, 2018June 18th, 2021Featured, Tenant

Size: 184,000 sq/ft
GC: Turner Construction
Electrical Crew: 32 at peak

Scope: Boston Consulting Group became the anchor tenant at 200 Pier 4 occupying 6 1/2 floors of the brand new office building.  J&M Brown was the electrical contractor for BCG’s office fit-out.  With the goal of having BCG move-in at the same time as the building was complete, J&M Brown purchased and installed over 1,300 light fixtures, cored 100 of holes for poke-thrus and synced the fire alarm system with the base building, in addition to completing the distribution and electrical construction of the floors.

Highlights

  • Furnished and managed the light fixture package
  • Emergency and normal Crestron lighting controls installed throughout
  • 5-story internal stairwell with fire curtain protection
  • Timeline: 9 months