Trinity Church, Boston, MA – Historic Restoration

Scope: Design-assist multi-phase historic renovation of church built in 1876. Installations included new electrical distribution system, security, fire alarm, and lighting control systems

Highlights

• Field engineering enabled project construction to be undertaken without interruption to Church activity over 5-year period
• Lutron multi-panel lighting control system with scene dimming system covering all aspects of building’s 60,000 sq. ft.
• Geothermal wells installed for heating and cooling
• Security installations included more than 40 cameras and several remote access locations
• Restoration won numerous national and local awards, including BSA, National Trust for Historic Preservation, and AGC
• Designed to achieve LEED Silver rating
• Project timeline: 5 years