Eli Lilly is expanding it’s Boston area presence with a new Institute for Genetic Medicine. J&M Brown was awarded the interior lab fitout of the entire building, which is expecting to be complete in 2024.
J&M Brown Company completed the 250,000 square-foot, 10-floor fit-out of Putnam Investments new headquarters at 100 Federal Street in the heart of Boston’s financial district.
The scope entailed comprehensive electrical distribution and lighting installations for the offices which house approximately 1,000 Putnam staff members. The project scope included eight floors of state-of-the-art offices, a 150-plus seat auditorium, conference centers, a network of meeting rooms, a new data center, a commercial kitchen, and a mezzanine roof deck.
Data center and electrical distribution installations included two UPS systems, three standby electrical risers and internal communications risers that are tied to the standby emergency generator. Six automatic transfer switches that tie into the generator were also installed.
The project team was headed by JMB Vice President and Project Manager Dennis Nigro and Foremen Bill Marchant, Dave Marchand, and Mike Sawyer.
Putnam moved from into its new 100 Federal headquarters from its former offices at One Post Office Square in October 2018.
Project Challenges
Coordination of multiple power shutdowns during the project to meet building owner and tenant requirements and also to ensure critical data was maintained throughout the project.
JMB met the fast-track, nine-month project schedule managing a crew of 50 IBEW Local 103 electricians at peak construction. To meet Putnam’s move-in schedule, the power distribution scope was completed in four months and 8 floors of elaborate office fit-out requirements were completed in only seven months.
###
J&M Brown was chosen as the Electrical Contractor for this 3 floor, 77,000 sq/ft fit-out in Boston, MA.
99 Summer enhanced their building with a brand new front entrance on Summer street. The upgraded entrance features table with booth seating, a video wall and new cafe. LED pendant light hang as high at 60′ in the air shining light through the glass wall, while undercabinent tapelight
J&M Brown was responsible for the complete demolition and electrical construction of Red Hat’s new office in the Seaport District.
Boston Park Plaza Hotel underwent a complete room renovation encompassing 1,100 guest suites and 14 common corridors.
Upgrade of main library on campus to meet the needs of modern education. J&M Brown was contracted to do the electrical, fire alarm, tel/data and security for this project providing a one-stop solution
A historic building converted into 48 luxury residential units keeping the original exposed brick and wooden beams. The upgraded look features LED track lighting, a new elevator and video intercom system.
Comprehensive, multi-phase electrical systems’ renovation at the historic Old South Church, 645 Bolyston Street in Boston, MA – circa 1875. Project included replacement of the electrical, fire alarm, security, tel/data, HVAC, elevator, and sprinkler systems.
A state-of-the-art facility right in the heart of the Longwood Medical area containing more than 400,000 sq/ft of laboratory, office and clinical space. Longwood Medical Center scales 11 stories high with an additional 3-level parking garage underneath. J & M Brown was responsible for core and shell and installed a complete electrical distribution system, emergency electrical distribution system and fire alarm system.