J&M Brown continues to do work at the old Boston Globe building on Morrissey Blvd. After completing the gut and renovation of the sprawling building,
J&M Brown was the electrical contractor for this 8-floor fitout at the newly renovated One PO Square building.
J&M Brown was the electrical contractor for this multi-phase project, where each floors comprised a different phase so parts of the library could remain open.
J&M Brown was called in to help design-assist a new electrical infrastructure that would get the hospital back up and running.
Construction is currently underway at this prime spot in the back-bay. J&M Brown is gearing-up for the Core & Shell buildout of this new 9-stpry, 220,000 sq/ft building.
J&M Brown is excited to be part of the team to modernize the lobby at International Place. The project is currently underway.
Eli Lilly is expanding it’s Boston area presence with a new Institute for Genetic Medicine. J&M Brown was awarded the interior lab fitout of the entire building, which is expecting to be complete in 2024.
15 Necco is a new, 12-story, 316,000 square-foot, life sciences development with ground floor retail space.