Complete renovation and upgrade of facility’s power distribution system.
Size: 5-story aboveground plus 3-level basement, 135,000 sq. ft. research lab facility
GC / Design-Build: Turner Construction
Electrical Crew: 50 at peak
Scope: Shell and core electrical construction of new research lab facility, which houses a state-of-the art clean room and features dust-free lab environments. Project included primary and emergency power, lighting, and fire alarm installations. Electrical work associated with an entire mechanical floor, which provides power and maintains optimal atmosphere for labs.
Highlights:
- State-of-the-art LISE facility features labs for nanoscale and mesoscale science
- Electrical installations for 10,000 sq. ft. clean room
- Entailed dozens of connections for special purpose mechanical equipment
- Timeline: 1 year
A state-of-the-art facility right in the heart of the Longwood Medical area containing more than 400,000 sq/ft of laboratory, office and clinical space. Longwood Medical Center scales 11 stories high with an additional 3-level parking garage underneath. J & M Brown was responsible for core and shell and installed a complete electrical distribution system, emergency electrical distribution system and fire alarm system.
Multi-phase, 4-year project included the replacement/retrofit of fire alarm systems in all six buildings of medical campus.
Core and shell electrical construction of new luxury residential/mixed-use building, including electrical distribution – primary and emergency power systems, lighting and lighting control system, fire alarm and security system.
In Boston’s Seaport, J & M Brown is underway with the waterfront’s newest residential tower, working with general contractor, John Moriarty & Associates. The project includes comprehensive core and shell electrical construction.
Comprehensive replacement/retrofit of historic hotel’s fire alarm system during hotel’s room renovation process.
Three phase fire alarm retrofit inclusive of installation of all new fire alarm devices for 38-story hotel’s common areas, 800 guest rooms, ballrooms, health club, The Palm and Turner’s Fisheries restaurants.
Demolition and electrical construction of Computer Hardware Lab and Design Simulation (Mathematical Monitoring) Lab. Fast-track 3-week project.
Electrical build-out of new 3-story addition to existing student resources center, administrative offices and function room. Installation/integration of fire alarm system.