Design-assist multi-phase historic renovation of church built in 1876. Installations included new electrical distribution system, security, fire alarm, and lighting control systems
Comprehensive electrical construction, including primary and emergency power systems, electrical fit-out of entire facility – research labs, classrooms and administrative offices, fire alarm system, and lighting system.
Comprehensive, multi-phase electrical renovation of historic MIT student residence building, circa 1901. Electrical re-construction of building’s state-of-the-art food servery and conference room on first floor; undergraduate student residences on floors 2 through 7.
Exterior lighting installations of historic Great Dome, comprised of high efficiency LED lighting and flood lighting and lighting control system.
Comprehensive electrical construction of hospital’s new Biomedical Imaging Core Resources (BICOR) Nuclear Imaging facility, housed in three separate buildings on the BWH campus.
Aggressive 4-month project entailed demolition of existing intensive care units and electrical construction of new intensive care units on BWH Hospital Tower’s 3rd floor.
Retrofit lighting throughout occupied law school facility, replacing and re-lamping more than 3,000 existing light fixtures with energy efficient LED fixtures and lamps.
In the heart of the Longwood medical area, J & M Brown is providing shell and core electrical construction of the 11-story Longwood Center. Concurrently, we are underway with the 150,000 sf fit-out of Dana-Farber’s state-of-the-art lab space.
Reconstruction of hospital’s entire 2nd floor, preceded by demolition of existing floor. Demolition and renovation of an adjacent 2-story facility.
Electrical and telecom renovations to majority of hotels guest bathrooms – 114 in total – in luxury hotel. J&M Brown also provided original core and shell electrical construction of Four Seasons Hotel and Residences in mid-1980s.